Applications · Data centers

Data Center Perimeter Intrusion Detection

A clean outer fence, an unpowered barrier around the power yard, and concealed sensing where nothing should show.

Site layout

What Goes Where on a Data Center Campus

A data center campus shows a tidy face to the street and keeps its power yard well protected. The landscaped strip between the two can carry a buried sensor.

A data center campus. Letters A to F mark the boundaries listed in the table.
A data center campus. Letters A to F mark the boundaries listed in the table.
BoundaryProductWhat It Does There
A Street-facing outer fencePerimFence FF-200A security fence, 0.6–3.0 m high, with the sensing fiber concealed inside it.
B Existing campus fencePerimOptic FO-750 / PerimOptic FO-700Sensing fiber on the fence: FO-750 in up to 4 zones of 300 m, or FO-700 locating events along up to 80 km.
C Substation and generator yardPerimTaut TW-100A physical barrier that alarms when a wire is pulled or cut. The detector needs no power and is unaffected by EMI/RFI.
D Landscaped bufferPerimTerra BF-300A buried cable with nothing visible above ground. Up to 800 m per processor, locating within 1 m.
E GatesPerimWave MW-400A microwave link across the gate lane, 5–200 m.
F Drainage culvertPerimGrille FF-250A fiber-sensing grille that closes the opening. It can be used under water.

Why PerimTaut

Why a Taut-Wire Barrier Suits the Power Yard

The substation and generators keep the campus running, so their yard deserves a real barrier. PerimTaut alarms when a wire is pulled or cut. Its detector draws 0 W and is unaffected by EMI and RFI.

The pull threshold is adjusted on site to filter out contact from animals and plants. The barrier rarely suffers damage while its protective materials remain intact, so it asks little of the facilities team.

Next step

What to Send Us

Send what you have. We reply with a preliminary zone proposal and equipment supply quote.

  • Enough to start

    1. Campus plan
    2. Fence types and lengths
    3. Where the power yard and the gates are
    4. Phasing, if the campus is expanding